University College School

University College School
Previous
  • UCS 1
  • UCS 2
  • UCS 3
  • UCS 4
  • UCS 5
Next

Key Information

Location: Hampstead

Cost: £4.6 million

Size:

Duration: 11 months

Additional Information: Client: University College School

This project at Hampstead involved the design and construction of a new modern languages and art, design & technology building on a confined site at the rear of the school. The buildings, framed in concrete on piled foundations, provide in excess of 2100m² of accommodation over two and three storeys. Brick elevations are Flemish bond with corten steel wall cladding.

A five-week-long value engineering exercise helped us to win this scheme.