Location: County Durham

Cost: £27 million

Size: 17,000 sq m

Duration: 108 weeks

Additional Information: Client: East Durham & Houghall Community College

This new build 17,000 sqm college incorporates numerous study rooms and classrooms, as well as a large performance theatre and areas for skills training in Construction and Art.

Extensive value engineering was a core part of the scheme, enabling us to produce a facility that has become an asset to the College.  Close liaison with the College ensured cost plan compliance and the delivery of first class facilities.

Also included in the works was an extension and refurbishment of the existing sports hall, including a new full size all-weather pitch which meets FA standards.

 

"The interface between construction activities and normal college operations has been well controlled with health and safety being very well managed both on the construction site and at the construction/college interface."

A Lockwood, Deputy Principal

"Miller Construction Limited used their education experience to provide a significant contribution, along with their sub-contract supply chain, to both the design development and value engineering process during the pre-contract stages.

"During the construction period their site management team delivered works to a high quality with site welfare, health and safety to a very high standard."
D.I. Ramage, Lambert Property Solutions

Winner: Considerate Constructor Bronze award 2009

2009 CCS Bronze